Infrastructure Repair & Rehabilitation

Construction

Infrastructure

Sporting Goods

Cars & Trucks

Modulars & RV's

Military Defense

Aerospace

News

Home

 

 

 

 

 

 

*

  • The American Society of Civil Engineers rates the US infrastructure D+

  • 26% of all bridges in America have been identified as structurally deficient or obsolete due to corrosion.

  • Repair of concrete bridge supports and decking is expensive, time consuming and creates traffic delays and safety hazards.

 

The Merkel Structural Wrap Solution

Reinforced structures can withstand lateral movement up to 12" without compromising integrity.

The Merkel Process extends the useful life of infrastructure, saving millions in replacement costs

A unique exothermic process which permits the rapid repair of cement/rebar infrastructures.

Reduced repair time means less cost for infrastructure owners and less traffic congestion.

.Reinforced structures can withstand earthquakes as high as 7.5 on the Richter Scale.

The green dots on this map indicate bridges that have been determined to be functionally deficient across the USA. In total, they amount to more than 130,000 structures.

The annual capital cost for the repair and replacement of functionally deficient structures is more than $12 Billion.

 

 

The Merkel Bridge Decking Solution

 

Composite decking to replace deteriorated concrete or wood decks takes only hours to complete.

Only minimal equipment and frame work are needed, increasing safety and reducing congestion.

Excellent corrosion resistance reduces maintenance costs and future replacement expense.

The Merkel Process complies with the AASHTO HS 25 Highway Bridge Design standard.

Good fatigue resistance and high strength to weight ratios yield high durability.

 

Merkel Composite Technology, Inc

  8133 South Palm Drive
Tempe, Arizona 85284

Phone:  602-579-1396
E-mail to: info@merkelcomposite.com